2 period repair work via 10 years of it a repair work designed in 2004. A point of this repair work? 1. Earthquake performance is given. 2. 3 rooms in the 2nd floor of underground-> are set to 2 rooms and it's upgraded. 3. Establishment of outdoor bath 4. Repair in the room in the 1st floor of underground
An original building is the one in a Showa early stage, and improvement of foundation and the 2nd floor of underground are RC1 bed on the 2nd floor of ground+ a wooden 3 layer. Reinforcement of foundation, addition of underground beam and shear wall were added and the strength of the whole building was raised. The 2nd floor of underground also redid with exterior and interior, and was a wide room with a deck closest to a new river. The concrete exposed conscious of "new total" was also made the total space taken in. A bathroom can enjoy itself while installing an outdoor hotspring bath and looking at the autumnal tints and a snow scene newly. It was the repair work which is also doing heat insulation construction of a sash and a wall, and while utilizing good and the warmth of the -Showa- early stage Misenkan has. 弥仙館ホームページ ミシュラン・ガイド奈良2017